“The Market” Seeks Approval in Ruckersville

By. Brent Wilson, Field Officer

clip_image006Tiger Fuel owns and operates the gasoline station at the southwest corner of the Route 33 and Route 29 intersection in Ruckersville.  Currently, they lease the food service portion of the building to Burger King. Well, if you want a whopper – you better get it soon.

On Wednesday (November 16thGordon Sutton, Director of Retail Operations for Tiger Fuel came to the Greene County Planning Commission meeting to request a Special Use Permit (SUP) for a car wash at their Ruckersville location.

The rest of the story for the highly visible corner in Ruckersville is that the current building will be demolished and a new structure will be constructed that will offer Tiger Fuel’s specialty sandwich shop The Market.

clip_image004_thumb.jpg

Gordon Sutton

Sutton indicated if he received all the required approvals in a timely fashion, he hoped the project including the car wash will be completed by end of next summer. The car wash is to be manned similar to other Tiger Fuel operations in Albemarle County.

Sutton came to the Planning Commission to request a Special Use Permit (SUP#16-005) for the car wash which is required by code. The balance of the project is permitted by right under the existing B-3 Zoning and, therefore, the SUP is limited to the car wash use.

There were no comments from the public. Several changes to the current layout are proposed.  There will only be one access point off Route 29 instead of the two that currently exist. The placement of the pumps will be rearranged to discourage drivers cut off the corner of Route 33 west and Route 29 south to avoid the stop light. The car wash will be constructed in the open space just west of the current building.

clip_image002While outside the purview of the Planning Commission, Chairman Jay Willer mentioned that Tiger Fuel will need to purchase increased water connection fees (known as Equivalent Dwelling Units or EDU’s).

Commissioner Vic Schaff  asked how much water will be used by the car wash. Planning Director Bart Svoboda said the car wash will recycle water which will minimize the consumption of water from 50-60 gallons per car at a normal car wash down to 22 gallons per car.

With only four commissioners present, the SUP was recommended for approved by a vote of 4-0. The SUP request will now go to the Board of Supervisors for their review and possible action at their December meetings.

Brent Wilson is the Greene County Field Officer for the Free Enterprise Forum a privately funded public policy organization.  The Free Enterprise Forum Field Officer program is funded by a generous grant from the Charlottesville Area Association of REALTORS® (CAAR) and by readers like you.  To support this important work please donate online at www.freeenterpriseforum.org

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: