$2 Million of Hydraulic Planning Funds Accelerated – Now What?

By. Neil Williamson, President

In late September, the Charlottesville Albemarle Metropolitan Planning Organization (CA-MPO) unanimously approved a resolution that read much like a list to the Santa Claus of transportation planning:

NOW THEREFORE BE IT RESOLVED, that the Charlottesville-Albemarle MPO Policy Board recommends to the Commonwealth Transportation Board, the Virginia Secretary of Transportation, the City of Charlottesville, Albemarle County and the Charlottesville Albemarle Metropolitan Planning Organization to immediately initiate the process for planning the transportation improvements of the Hydraulic and Route 29 intersection and nearby roadways as identified in the MPO’s Long Range Transportation Plan (2040 LRTP) and to enact and implement the recommendations in coordination with comprehensive land use planning including but not limited to the following:

  1. Continue the facilitated collaborative panel process to determine a potential range of reasonable options for reducing congestion and improving mobility in the general area of the Hydraulic-US 29 intersection, including the option of doing nothing.
  2. Request the CTB to combine Hillsdale South and Hydraulic Intersection planning and preliminary engineering budgets into one consolidated planning and preliminary engineering budget.
  3. Request the CTB to amend the Six Year Improvement Plan (SYIP) to advance funding for small area planning and panel discussions to begin in FY17.
  4. Request the Secretary of Transportation to authorize the MPO to lead and use transportation financial resources to conduct a small area planning process for the Hydraulic Intersection general area of the City and County, such small area planning to include transparent citizen, business and community engagement.
  5. Request the Secretary of Transportation to begin the transportation planning process so that adequate information will be available to apply for Smart Scale funding by September, 2018 should a project or projects move forward from the collaborative planning process.  Emphasis added- NW

Christmas may have come early for the CA-MPO.  On November 3rd, Virginia’s Secretary of Transportation Aubrey Layne, Charlottesville and Albemarle County have received “accelerated” funds for the Hydraulic Road Area Study. In his letter to CA-MPO Executive Director Chip Boyles, Layne wrote:

We look forward to the continued progress and movement, specifically with the Hydraulic Road Area Study, in order to keep Virginia moving through the Charlottesville Area…By leveraging funds between the two current projects (Hydraulic Road and Hillsdale Drive South), we will be able to commit funding in the amount of $1,000,000 for the study in this current fiscal year (FY 2017) with an additional $1,000,000 available on July 1, 2017.

The Free Enterprise Forum sincerely appreciates the forward thinking of the CA-MPO working backwards from the time of the next round of competitive funding; we also have a great deal of angst about the methodology that might or might not be used in creating this “transparent process”.   We also understand the a total of $10 million dollars for “preliminary engineering” was included as part of the approved Route 29 Solutions package.

Back in May of 2014, we wrote about Playing Dominos with a the series of interchanges resulting in the US 29 Expressway.  We have many of the same concerns we raised in that post:

No one believes that the interchange at Rio is the end, it is like putting in a 4 inch pipe on a 2 inch line, while the water will move freely on the larger connector it really does little good for the overall velocity of the water until you expand the whole line.

It is strategically important to recognize the proposed Shucet Solution is being offered as an all or nothing opportunity with a time deadline.  He (and the McAuliffe Administration) knows that is if  Domino #1 falls and Domino #2 [Hydraulic] starts to tilt – the eventual expressway will be well on its way to completion.

Once these first two dominos fall, we will start to see the calls for access management and more “grade separated intersections”.  The “depressed express lanes” will start at the Wal-Mart at Hilton Heights Road and will logically terminate with a set of flyover exit ramps to 250.

Currently the State has found the proper leverage points to “facilitate” a solution on the Charlottesville area.  The timing, strategy and tactics they have used have been nothing short of amazing.  They held an advisory panel of opinion leaders without a single vote or test for consensus, they truncated the timing of the process to elude the July 1 deadline of HB #2 that requires project prioritization and they are poised to get Charlottesville to give up almost two decades of opposition to the highly disruptive Hydraulic/US29 Interchange. 

Chess Master Bobby Fisher once said, “Tactics flow from a superior position”. Even when it is not in the best interest of the community, one must recognize the excellent gamesmanship exhibited by both Shucet and Virginia Transportation Secretary Aubrey Layne.

Well played, gentlemen, well played indeed.

We sense gamesmanship is again at work in this acceleration process.  With the new “accelerated” funding will the CA-MPO reach out to other major users of US 29 for the panel discussions?  Considering three corners of the Hydraulic intersection are n the City of Charlottesville and one is in Albemarle County, who will drive the small area planning?  How will the City and County Planning Commissions be engaged?  Or will they?    Considering the careful wording of the CA-MPO resolution is there any community or political support for another grade separated interchange on US 29?

As usual we have more questions than answers.

Respectfully submitted,

Neil Williamson


Neil Williamson is president of the Free Enterprise Forum, a privately funded non-profit public policy organization focused on local governments in Central Virginia. For more information visit www.freeenterpriseforum.org.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: